A 1,600 hectare solar farm including battery storage and grid infrastructure.
One Earth Solar Farm Ltd (PS Renewables and Orsted)
High Marnham, Nottinghamshire/Lincolnshire
Environmental Strategy and Leadership
EIA Management
Air Quality
Biodiversity
Carbon & Climate Change
Flood Risk & Drainage
Noise
Socio-Economics
NSIP solar farm to provide renewable energy to more than 200,000 UK homes. Application includes the impact from the construction, operation and decommissioning phases.
Logika have managed and coordinated the EIA technical services. To date this includes baseline surveys, RAG rating, material for and attendance at consultation events, production of EIA documentation (scoping report and PEIR), bespoke EIA tools for the environmental team and consultee and parish council meetings.
Flood is a key constraint for the project. The solar panels are located within Flood Zones 2 and 3, to maximise the amount of solar infrastructure the base height has been increased at varying levels. This approach has been agreed with the Environment Agency.